Valeo China CTO Gu Jianmin: Accelerating Vehicle Development Does Not Mean Compressing Verification

Edited by Betty From Gasgoo
Main productsAluminum die castings and forgings
Main productsGenerator, Communication module, T-BOX, Front-view camera, Driving ADAS, Permanent magnet synchronous motor, Powertrain, Wiper blade, Washer, Headlight, Battery condenser, Thermal management system, Electronic control unit, DMS algorithm, DMS integration, LiDAR, Forward millimeter-wave radar, Wireless phone charger, Wireless phone charger, 15mm ultra-thin lighting module, Dynamic projection carpet light, Dynamic interior ambient lighting, Battery thermal management direct cooling plate

Gasgoo Munich- Speaking at the 14th Automobile & Environment Innovation Forum and the 8th Gasgoo Awards ceremony "China Solutions, Global Value" on October 23, Valeo China CTO Gu Jianmin addressed the industry's shrinking development timelines — and the growing controversy over "fast-tracked" vehicles.

Gu argued that while compressing timelines is inevitable, it shouldn't be conflated with quality issues. "Shortening the cycle isn't the problem; a lack of sufficient verification — and the resulting product failures — is the real issue."

He revealed that nearly two-thirds of Valeo's product development cycles have been slashed from dozens of months to just a few in recent years. Headlight development, for instance, has fallen from 18 months to just seven or eight.

ABC08168-opq5120054623.jpg

With development windows tightening so drastically, how is sufficient verification guaranteed?

Gu explained that accelerating development isn't about simply compressing existing workflows. Instead, it's about boosting efficiency through front-loaded R&D, platform-based development, and digital tools.

Early co-creation with automakers is particularly critical. Suppliers engage in pre-research and development of product functions and performance targets well before receiving a formal order. In some cases, prototypes are already at the B-sample stage by the time the contract lands.

This means that while the industry sees a drastically shortened timeline from order to mass production, the extensive pre-research work that preceded it remains unaccounted for.

Meanwhile, platform-based and modular development cuts down on repetitive design, while virtual simulation, CAE, and AI tools further streamline both development and verification.

Gu emphasized that the true measure of development quality isn't the length of the cycle, but whether sufficient verification and market feedback have been achieved. Automakers and suppliers must also shift from a traditional client-vendor dynamic to one of joint innovation — sharing verification costs and scenario data to accelerate technical validation and mass production.

GlobalSupplier
Location: Philippines/Metro Manila
Main productsAluminum die castings and forgings
Valeo ChinaSupplier
Location: China/Shanghai/Shanghai/Xuhui District
Main productsGenerator, Communication module, T-BOX, Front-view camera, Driving ADAS, Permanent magnet synchronous motor, Powertrain, Wiper blade, Washer, Headlight, Battery condenser, Thermal management system, Electronic control unit, DMS algorithm, DMS integration, LiDAR, Forward millimeter-wave radar, Wireless phone charger, Wireless phone charger, 15mm ultra-thin lighting module, Dynamic projection carpet light, Dynamic interior ambient lighting, Battery thermal management direct cooling plate

Gasgoo not only offers timely news and profound insight about China auto industry, but also help with business connection and expansion for suppliers and purchasers via multiple channels and methods. Buyer service: buyer-support@gasgoo.com Seller Service: seller-support@gasgoo.com

All Rights Reserved. Do not reproduce, copy and use the editorial content without permission. Contact us: autonews@gasgoo.com

Related Documents(3)

China Passenger Vehicle Export Rankings for H1 2026.zip
Rankings of smart cockpit component suppliers in China (Jan.-Jun. 2026).zip
Rankings of ADAS component suppliers in China (Jan. - Jun. 2026).zip